Renovations planned for DFW airport hotel

The Grand Hyatt in Dallas-Fort Worth airport has announced it will begin a multi-phased renovations project in July.

The hotel, located in Terminal D, will be updating its suites and guestrooms. Additionally, there will be improvements to its restaurants and bars, and enhancement of its event spaces, as well as redesigned guest lounges, lobby, and corridors.

Revamps like this often bring a need for Graphic Design Services for a freshened look.

Among the changes to be made at the hotel are an increase in suites and guestrooms from 298 to 315. Other changes will include new charging ports, large HD flatscreen TVs, an expansion of closets and the updating of bathrooms with larger showers, tubs, and vanities. In addition to the changing of the sleeping accommodation, the grand Met restaurant will have a refreshed lounge with an updated menu featuring seasonal items and locally sourced dishes used in international and modern cuisine. Seating capacity in both the lounge and the restaurant will be increased.

Only steps away from Terminal D’s TSA checkpoint, the renovated hotel lobby will sport marble tile flooring, wood paneling, and locally created artwork. Other changes will include a 6,600 square foot ballroom, 20,000 square feet of event and meeting space, and a unique rooftop indoor-outdoor event space and pool overlooking the runways.

Grand Hyatt expects to have its DFW hotel renovations finished by the end of 2025.

Get a Free Quote for Graphic Design Services